Upgrade and Construction of a new Electron Microscope Facility, incorporating specialised electron microscope laboratories and support labs. Installation consisted of 2 x Air cooled chillers, 2 x gas fired condensing boilers, pumps and pipe work reticulation throughout the facility to in ceiling mounted FCU’s, 4 x Close Control AHU’s with HEPA filtration supplying conditioned air to ceiling mounted fabric duct distribution systems, providing air at low regulated velocities, all installed to meet critical vibration, noise and Green Star criteria.